  • PERENCANAAN KEBUTUHAN BAHAN BAKU MENGGUNAKAN METODE MATERIAL REQUIEREMENT PLANNING (MRP) ( STUDI KASUS : SHIRAKATA ENGINEERING - PASURUAN)
    Penulis : DIANA AGUSTINA
    Dosen Pembimbing I : HERI AWALUL I ST,.MT
    Dosen Pembimbing II :IMRON KUSWANDI ST,.MT
    Abstraksi

    Penelitian ini bertujuan untuk menentukan jumlah pemesanan material produksi di Shirakata Engineering. Perusahaan tersebut memproduksi dua jenis produk mesin yaitu mesin pemipih-pemotong mie dan mesin mixer, selama ini besaran pembelian bahan baku produksi hanya ditentukan berdasarkan intuitif semata sehingga keterlambatan produksi sering terjadi. Metode yang digunakan dalam penelitian ini menggunakan 5 metode lot sizing yaitu Economic Order Quantity (EOQ), Least Unit Cost (LUC), Least Total Cost (LTC), Silver Meals dan Period Order Quantity (POQ). Produk mesin pemipih-pemotong mie diperoleh total biaya persediaan bahan baku minimum dari metod Least Total Cost dengan jumlah sebesar 3.199.620, dan produk mesin mixer diperoleh total biaya persediaan bahan baku minimum dari metode Silver Meals dengan jumlah sebesar 1.166.484. Kata kunci : Material Requirement Planning, Lot sizing

    Abstraction

    This study aims to determine the number of reservations in the production of material Shirakata Engineering. The company manufactures two types of products, namely machine-cutting machine pemipih noodles and mixer machine, this time the amount of the purchase of raw material production is only determined based solely intuitive so that production delays often occur. The method used in this study using a 5 lot sizing method is Economic Order Quantity (EOQ), Least Unit Cost (LUC), Least Total Cost (LTC), Silver Meals and Period Order Quantity (POQ). Pemipih-cutting machine products obtained noodles total inventory cost of raw materials a minimum of metod Least Total Cost to the sum of 3,199,620, and mixer machine products obtained total inventory cost of raw materials a minimum of Silver Meals methods amounting to 1,166,484. Keywords: Material Requierement Planning, Lot sizing

Detail Jurnal